Skip Ribbon Commands
Skip to main content

Quick Launch

Outage Information > Hatch
June 15
WELCOME TO PLANT HATCH SPRING 2015 OUTAGE

INFO ABOUT THE SPRING 2015 PLANT HATCH OUTAGE.
THE PLANT HATCH OUTAGE SHUT DOWN DATE IS Feb. 8th. IT IS SCHEDULED FOR 30 DAYS AT THIS TIME. PLEASE CHECK WITH RECRUITERS FOR YOUR REPORT DATE.
 
TIM LAWSON WILL AGAIN BE THE SITE MANAGER FOR THE OUTAGE. HIS CELL PHONE NUMBER IS 229 589 2200.

 

June 15
REPORTING INFORMATION

07:00 IS THE REPORT TIME ON THE DAY OF YOUR REPORT DATE. PLEASE REFER TO THE REPORT DATE GIVEN TO YOU BY THE HOME OFFICE RECRUITERS.
 
ON YOUR FIRST DAY PLEASE REPORT DIRECTLY TO THE ARMORY-4533-4813 HATCH PKWY S., BAXLEY GA 31513.  THE ARMORY 5 MILES SOUTH OF TOWN. PLEASE CALL TIM LAWSON IF YOU ARE HAVING DIFFICULTIES FINDING THE LOCATION. TIM'S NUMBER IS 229-589-2200.

 

Armory Map

June 15
WHAT YOU WILL NEED WHEN YOU SHOW UP ON SITE

A VALID DRIVERS LICENSE AND YOUR SOCIAL SECURITY CARD. A PASSPORT WILL NOT DO. THIS A SOUTHERN COMPANY STIPULATION, PLEASE BE PREPARED.
 
PLEASE ADHERE TO THE PERSONNEL DRESS POLICY, WHICH REQUIRES US TO WEAR FULL-LENGTH PANTS, SLEEVED SHIRTS WITH NO OFFENSIVE LAUNGAUAGE OR SYMBOLS. PLEASE BE CLEAN SHAVEN.

 

June 15
NUF EXAM

​THE NUF EXAM IS GOOD FOR 5 YEARS AT HATCH. IF YOU KNOW YOU NEED TO TAKE IT PLEASE NOTIFY US SOON AS YOU CAN. STUDY MATERIAL CAN BE MADE AVAILABLE TO YOU IF NEEDED. A PASSING GRADE OF 80% OR BETTER IS REQUIRED.

June 15
PPE / SCRUBS

PERSONAL MODESTY GARMENTS ARE REQUIRED.

EVERYONE IS EXPECTED TO WEAR ANSI Z75 STEEL TOE SHOES INSIDE THE POWER BLOCK.
 
 
 
PLEASE BRING YOUR HARDHAT FROM YOUR LAST JOB ASSIGNMENT IF POSSIBLE.

 

June 15
BANKING INFO

PLEASE SEE TIM LAWSON FOR LOCAL BANKING INFORMATION.

June 15
MISCELLANEOUS NOTES

​Please feel free to call Sam Bass at 800 225 0385, ext. 1233 or TIM LAWSON at 229 589 2200 for other concerns or information about the outage.

June 15
DIRECTIONS TO SITE LINK

http://maps.google.com/maps?t=h&q=31.9344,-82.3435

From Vidalia you will travel south on US-1 approximately 23 miles. Hatch is on the left. The contractor access road is the second road to the left from Vidalia.

From Baxley you will travel North approximately 10 miles. The contractor entrance will be the first road you come to from the South.

The simulator building is directly East from the contractor parking lot.

June 15
LODGING: