L2R17 Spring Outage

For all BHI Energy/Power Services folks coming to LaSalle’s Outage, first let me say Thank you. My name is Marta Overstreet and I am the Site Coordinator. The report time is 0700. We will be at the Services and Training Center (STC) for inprocessing. The address is 36400 S. Essex Road Wilmington, IL 60481. The address for the plant is 2601 N. 21st Road Marseilles, Il 61341.

 

 As you arrive, you will pick up a site inprocessing folder and will be directed to your first room assignment. In this folder, look for the purple training schedule. This will have a list all of your  In processing classes required prior to badging. Do not be late to classes; no late entries are accepted and you will have to re-schedule. This will delay badging.

 
If you are new to Exelon West, this is what to expect for training.  You will follow the above for in processing training.  All RP procedure training is to be completed on line before arriving at the site.
 
 

I will be in the cafeteria with folders containing BHI Energy/Power Services inprocessing paperwork. Please stop by prior to going to your first room. Most of our folks will have FFD scheduled right away, so plan accordingly. If you are going to be late, please call. I will have my cell phone and will check messages regularly. My number is 815-830-2029. Reception is limited within the building.
 
The outage is scheduled to begin February 18, 2019. The outage duration is approx. 18 days.  During the outage we will work seven twelve’s (84 hours per week). Prior to the outage we will work five eight’s (40 hours per week) with limited overtime.
 
If you have any questions not addressed on the blog, please feel free to call or email me. My email address is marta.overstreet@exeloncorp.com.

 

January 09
Lodging

 

 
www.vrbo.com (Vacation Rentals By Owner)
 
Riverhouse B & B (ottawariverhouse.com)
 
121 E Prospect, Ottawa, IL  61350  (815) 324-2866
 
Special Rates apply for Outage workers, call the number above.
 
 
4115 Holiday Lane, Ottawa, IL
 
 
120 W. Stevenson Road, Ottawa, IL‎ - (815) 433-0029
 
 
4115 Holiday Lane, Ottawa, IL- (815) 434-6040
 
 
500 East Etna Road, Ottawa, IL‎ - (815) 434-2888
 
 
510 E. Etna Rd., Ottawa, IL‎ - (815) 433-9600
 
‎Four Star Campground
 
‎ 2776 E 2625th Rd,  Marseilles, IL 61341‎
 
 
 
 
1705 N. Bloomington Street, Streator, IL‎ - (815) 672-0080
 
 

 

 

200 Gore Road, Morris, IL

 

 

70 Gore Rd. W., Morris, IL‎ - (815) 942-1433

 

 

80 Hampton Street, Morris, IL‎ - (815) 942-9000

 

 

70 Green Acres Drive, Morris, IL‎ - (815) 942-3200

 

 

222 Gore Road, Morris, IL‎ - (815) 941-8700

 

 

 

 

14 E. Northbrook Drive, Dwight, IL‎ - (815) 584-1888

 

1823 West Reynolds Street, Pontiac, IL‎ -

 

 

January 03
Exelon Inprocessing Checklist

Exelon Inprocessing Checklist

Listed below are items that individuals inprocessing at one of our Nuclear Facilities shall arrive with on their hire day.
The following are required items:
v State or Government Issued Picture ID (If picture is on a valid, e.g., not expired, etc. Drivers License that will be sufficient)
v Social Security Card/Work Visa #/Naturalization Certification #
v Location and date of last Unescorted Access to any nuclear station in the US
v Education Institutions, city & state addresses, dates attended (information should include high school)
v Four personal references (must be available for contact)
Ø Names, addresses & telephone numbers (day/evening)
(References cannot be related to the individual or residing in their home)
v Employment History (3 years or since last unescorted access)
Ø Company names, addresses & telephone numbers
Ø Dates employed (from & to) (Must include Month/Day/Year)
Ø Name of a contact person for each company
v Unemployment Periods
Ø Dates Unemployed (From & To) (Must include Month/Day/Year)
Ø Must be verified by a personal reference (can be related) with a telephone number
v Credit History
Ø Must List 1 creditor (VISA, Master Charge, etc.) and explain any credit difficulties. Foreign Nationals must bring in a credit report from Country of Origin.
v Residences for Last 5 Years or since last unescorted access
v Arrest Documentation
Ø All Arrests, since your 18th birthday, need to be reported (Except Minor Traffic e.g. Speeding or Parking).
· You Must Bring the Arresting papers & Final Court Disposition for any arrest occurring within the last 5 years.
· If It Is a single DUI Arrest within 365 days, you must bring copies of the Arresting papers, the Court Disposition, the Evaluation by a Certified Addiction Counselor and any treatment requirements.
· Any PENDING DUI Arrests must have a current Evaluation by a Certified Addiction Counselor.
· You may be required to provide documentation for any arrest.
v Fitness for Duty
Ø All persons must successfully pass a Pre-Access Drug & Alcohol Test
All persons applying for Unescorted Access MUST Indicate:
¨ If you have ever been denied unescorted access at any nuclear power plant.
¨ If you have ever been removed from or made ineligible for unescorted access to any nuclear facility, Technical Support Center (TSC) or Emergency Operations Facility (EOF) for a violation of a Fitness For Duty Program.
¨ If you have violated an employer’s drug and alcohol testing program.
¨ If you have subverted or attempted to subvert a drug or alcohol testing program or refused to take a drug or alcohol test.
¨ If you have used, sold or possessed illegal drugs or abused illegal drugs.
¨ If you have had legal or employment action taken for alcohol or drug use.
¨ If you have been subjected to a plan for substance abuse treatment (except for self-referral)
¨ If you have tested positive for illegal drugs or use of alcohol that resulted in on duty impairment, or pre-employment testing.

PROBLEM
ACTION(S) REQUIRED FOR INDIVIDUAL TO BE CONSIDERED FOR ACCESS
DRUG AND ALCOHOL RELATED ISSUES
Individual has one or more DUI arrests and/or convictions or any pending DUI arrest: Individual must show up on site with disposition of court case and documentation of any effective chemical dependency evaluation by a Certified Additions Counselor* and/or treatment following each event.
Individual has three (3) or more DUI arrests, resolved or unresolved:  Individual may not be eligible for unescorted access. Contact the appropriate Exelon Security Reviewer prior to arriving on site to process.
Individual has a non-nuclear Fitness for Duty violation. Individual must provide documentation of a Certified Addictions Counselor’s evaluation, completion/progress of treatment or rehabilitation prior to arriving on site to apply for unescorted access. In order to be approved, contact the appropriate Exelon Security Reviewer prior to showing up on site.
Individual has ever been refused or discharged from employment for a violation of a Fitness for Duty Program. Individual must provide documentation of a Certified Addictions Counselor’s evaluation, completion/progress of treatment or rehabilitation prior to arriving on site to apply for unescorted access. Approval to be determined by Exelon Security Reviewer.
Individual has been subjected to a plan for treating substance abuse except for self-referral for treatment over any period of time. Individual must show up on site with documentation of a Certified Addictions Counselor’s evaluation, completion/progress on treatment or rehabilitation. Approval to be determined by Exelon Security Reviewer.
Individual has tested positive for illegal drugs or use of alcohol that resulted in on duty impairment. Individual must provide documentation of a Certified Addictions Counselor’s evaluation, completion/progress of treatment or rehabilitation prior to arriving on site to apply for unescorted access. In order to be approved, contact the appropriate Exelon Security Reviewer prior to showing up on site.
PSYCHOLOGICAL ISSUES
Individual requires a clinical interview due to results of the MMPI. Individual must have a clinical interview and the resulting evaluation must be favorable. Exelon will set up the appointment and cover the expense of the interview. Individual will be expected to comply with the instructions provided by Security.
CRIMINAL HISTORY ISSUES
Individual should be prepared to list all arrests (e.g., Criminal Charges, Convictions or Proceedings) since their 18th birthday or since their last unescorted access whether convicted or not convicted. Individuals should list all felony, misdemeanor, traffic or military criminal history to include court martials or non-judicial punishment. This includes guilty pleas and nolle contendere, any suspended sentences, pre-trial diversions, dismissals, nolle prosse, or first offender cases. (Individuals may omit speeding tickets or parking tickets) All alcohol related arrests must be listed.
Individual must show up on site with documentation of disposition of court case(s) and may require an interview by Exelon Security.
Documentation may be required for any arrest outside of the 5 year scope as deemed necessary by the Exelon Security Reviewer.
Results of fingerprints from the FBI will be received prior to granting Unescorted Access.

 
MISCELLANEOUS ISSUES
Individual has other than “Honorable Discharge” from the Armed Services. Individual must contact the appropriate Exelon Security Reviewer for an interview and supply any additional information required.
Individual has been denied access at any nuclear facility over any period of time. Individual must contact Exelon Security for an interview prior to individual’s arrival on site and supply any additional information required as appropriate by the Exelon Security Reviewer.
CONTACT WITH EXELON SECURITY REIVEWER REQUIRED
Probation, parole or work release. MUST contact the appropriate Exelon Security Reviewer prior to arrival on site.
Individual has any Fitness for Duty violations, nuclear, non-nuclear or a combination of the two. MUST contact the appropriate Exelon Security Reviewer prior to arrival on site.
Individual has any drug related arrests. MUST contact the appropriate Exelon Security Reviewer prior to arrival on site.
Individual has an arrest and/or conviction for the sale, delivery or manufacture of illegal drugs. MUST contact the appropriate Exelon Security Reviewer prior to arrival on site.
*Certified Addictions Counselors may be found in the yellow pages of your phone book or contact your nearest addictions center or hospital for referral.
 ​
December 28
Details

Important:
You need 2 forms of ID. One must be a valid government issued photo ID (Valid {NOT EXPIRED} Driver’s License, State ID, or Passport), and the other should be your social security card, or ORIGINAL birth certificate. Senior HP techs must take the Nuclear Utilities Fundamentals Exam (NUF) and pass with a grade of 80% or better, unless you are either an NRRPT “active participant”, or have taken the NUF within the past 5 years and passed with 80%. NRRPT and prior test results must be verified, so bring your NRRPT certificate with you, or know where and when you last passed the NUF, in case it is not recorded in PADS. If we cannot verify your status, you will be required to take the test about midweek. Juniors will be required to take a theory exam, unless they have taken and passed the NUF with an 80% or better. Study material can be found at www.westrain.org Study sections RP-3 and RP-5.
Miscellaneous:
Hard hats and safety glasses are available, however if you have your own favorites, they are acceptable as long as they meet ANSI standards. If you have been issued hardhats at a previous outage, please bring it with you. No shortpants are allowed in training. You must have on longpants and a sleeved shirt. Composite toe or Steel toe shoes are required. Work shoes must be worn during in-processing. Scrubs are provided on-site. Bank runs and other off-site errands will be very hard to accommodate during the first couple days of training, especially for non-returnees, as the in-processing schedule for those days is fairly tight.

January 07
Shift Preference

If you have a compelling shift preference, please email me right away as I am currently developing the outage org chart.
My email address is marta.overstreet@exeloncorp.com If you do not contact me prior to arriving, there is a good chance I will not be able to change your shift once you get here.
Thanks!
 

June 15
About LaSalle

​LaSalle County Generating Station, located in rural LaSalle County in Northern Illinois, is a two-unit nuclear generating facility capable of generating 1,140 net megawatts per unit. Together the units can produce enough power to support the electricity needs of over two million average American homes.

Its Units 1 and 2 began commercial operation in August 1982 and April 1984, respectively. Both of LaSalle's units are boiling water reactors designed by General Electric. The units are cooled with water from a 2,058-acre man-made lake, which is also a popular fishery managed by the Illinois Department of Natural Resources.

June 15
Exelon Map (NOT TO SCALE)

Exelon Map