Skip Ribbon Commands
Skip to main content

Point Beach

:

Quick Launch

Outage Information > Point Beach > Posts > WELCOME TO POINT BEACH SPRING 2019 OUTAGE
June 15
WELCOME TO POINT BEACH SPRING 2019 OUTAGE

       

 

INFO ABOUT THE SPRING 2019 POINT

BEACH OUTAGE

 

Plant Directions

 
Go about 10 miles north of Two Rivers on route 42.

 

Turn right in Nuclear Road (East toward the lake).  Go approximately 1 mile turn left on to the site, the turn is marked with a lighted sign.  Follow the road to the right at the 15mph sign. Parking areas are located on the right side of the road in the gravel lot prior to the stop sign and north of the energy center. The Training Building is the 2 story building on the left as you drive in. Parking around the training building is for FPL employees only.

 

 

PLACES TO STAY: Fox Hills Resort in Mishicot about 6 miles from the plant.  Contact Michelle Farr at 920 755 3620 or mfarr@fox-hills.com for rates.
 
PPE correction: Please wear a sturdy
upper leather ANSI Z75 steal toe shoe.
No atheltic type shoes are allowed.
 
THE POINT BEACH OUTAGE SHUT DOWN DATE IS March 22nd, 2019. IT IS SCHEDULED FOR ABOUT 26 DAYS AT THIS TIME.  THE MAIN REPORT DATE AT THIS TIME WILL BE March 18th or 19th, 2019.. CHECK WITH YOUR RECRUITER FOR YOUR ACTUAL START DATE. 0630 IS THE REPORT TIME.
 

 

Comments

There are no comments for this post.