Skip Ribbon Commands
Skip to main content

VC Summer

:

Quick Launch

Outage Information > VC Summer
March 11
PER DIEM CHANGES - FREQUENTLY ASKED QUESTIONS

​BHI Energy recently made changes to the payment method of per diem for eligible employees.  To assist you in understanding these changes, we have prepared the following answers to some Frequently Asked Questions (FAQ). If you need further information or have any questions, please call the Payroll Department @ 800-225-0385

1)    If I already have Direct Deposit (DD) will my Per Diem (PD) automatically be deposited ?  YES
2)    Can I still elect to receive a “live” PD check?  PD is a non-taxable earning code on the weekly check.  It is no longer a separate check.  The entire check is paid either DD or live check, based on employee set up.
3)    Is travel expenses and/or travel day PD included as a DD?  For employees recruited out of the Piedmont SC office, travel is part of the weekly check (i.e., would be DD if employee is set up for DD).  For employees recruited out of the Weymouth MA office, travel continues to be a live check.  As we continue to streamline operations, we expect to have a consistent process by year end.
4)    Will cash advances be DDed?  Per Diem advances will continue to be a live check.
5)    Will bonuses/incentives be DDed ?  Bonuses will continue to be a live check.
6)    Can PD be DDed into a different account?  Employees are set up for one direct deposit account.  The entire check is DD into the one account in the employee record.  To ensure operational efficiency and reduced account maintenance and minimal direct deposit rejects, the limit is one account for DD.
7)    How will it appear on my stub?  The Per Diem is a separate non-taxable line item on the check.  The earning code (PD1) shows as a separate line on the check.  The number of days per diem, the per diem rate, and total amount shows on the check stub.
8)    Will my W-2 be any different?  The Per Diem will not show on the W2 earnings, as per diem is not taxable wages.
9)    Can I opt out of DD?  To delete DD, please email payroll@bhienergy.com requesting to cancel DD.  Please include name and last 4 digits of SSN.




June 18
WELCOME TO VC SUMMER'S FALL 2018 OUTAGE

​INFO ABOUT THE FALL 2018 VC SUMMER OUTAGE.

Picture    Picture

 

 

THE VC SUMMER OUTAGE SHUT DOWN DATE IS OCTOBER 5TH, 2018. IT IS SCHEDULED FOR 46 DAYS AT THIS TIME. THE REPORT DATE WILL BE TUESDAY, OCTOBER 2ND AT 0500. PLEASE REPORT TO UNIT 2/3 PARKING LOT LOCATED OFF HWY 213.  YOU WILL RECEIVE YOUR PARKING PASS, ONCE YOU HAVE RECEIVED THIS PLEASE GO THE TRAINING FACALITY LOCATED AT UNIT 1 OFF OF HWY 215. YOU WILL NEED APPROPIATE CLOTHING FOR INPROCESSING, NO SHORTS AND OR TANK TOPS.
 
KEN POLATTY IS THE SITE MANAGER, 803-345-4360, AND Todd Cornwell will BE THE SITE COORDINATOR FOR THE OUTAGE.

 

June 18
REPORTING INFORMATION

After receiving your parking pass at units 2/3 between 5am and 6am then report to Unit 1 training center by 6:30am on October 2nd.
 
ON YOUR FIRST DAY PLEASE REPORT TO THE NUCLEAR TRAINING FACILITY FOR IN-PROCESSING. BUILDING.
 
PLEASE BRING PROOF OF YOUR LATEST PHYSICAL.

June 18
WHAT YOU WILL NEED WHEN YOU SHOW UP ON SITE

A VALID DRIVERS LICENSE AND YOUR SOCIAL SECURITY CARD. A PASSPORT WILL NOT DO. THIS AN FPL STIPULATION, PLEASE BE PREPARED.
 
PLEASE ADHERE TO THE PERSONNEL DRESS POLICY, WHICH REQUIRES US TO WEAR FULL-LENGTH PANTS, SLEEVED SHIRTS WITH NO OFFENSIVE LAUNGAUAGE OR SYMBOLS.

June 18
NUF EXAM

​THE NUF EXAM IS GOOD FOR 5 YEARS AT VC SUMMER. IF YOU KNOW YOU NEED TO TAKE IT PLEASE NOTIFY US SOON AS YOU CAN. STUDY MATERIAL CAN BE MADE AVAILABLE TO YOU IF NEEDED. A PASSING GRADE OF 80% OR BETTER IS REQUIRED. JR HP's need to make 80% or greater.

June 18
PPE / SCRUBS

EVERYONE IS EXPECTED TO WEAR ANSI Z75 STEEL TOE SHOES INSIDE THE POWER BLOCK.
 
PLEASE BRING YOUR HARDHAT FROM YOUR LAST JOB ASSIGNMENT IF POSSIBLE.

June 18
BANKING

​There are Bank of America's in the area that will cash your checks.

June 18
MISCELLANEOUS NOTES

Please feel free to call Sam Bass at 800 225 0385, ext. 1233 or KEN POLATTY at 803 345 4360 for other concerns or information about the outage.

June 18
DIRECTIONS TO SITE LINK
June 18
LODGING: